Chemical Spill Cleanup

An accidental spill of liquid fertilizer occured and was contained within the safety berms of the client.

discussion with site managerDiscussions with the site manager resulted in a plan for Core Projects Group to remove the millions of gallons of contained spill liquid by pump and barge.

1.2 million gallons of liquid pumped to barge for removal/disposal.

liquid pump

Liquid was pumped from within the berm to a holding tank on site, then by pipeline to awaiting barges in the Port of Corpus Christi.

Lab testing established chloride levels, specific gravity and chemical content.

lab testing

Proper disposal/recycle program was engineered to dispose of liquid based on lab testing.

Liquids transported and disposed.

liquids transported and disposed.

Liquid was pumped from within the berm to a holding tank on site, then by pipeline to awaiting barges in the Port of Corpus Christi.

Final cleanup

final cleanup

All liquid was pumped from inside berm. Soil then sampled and any affected soil was treated and site declared remediated.