Chemical Spill Cleanup
An accidental spill of liquid fertilizer occured and was contained within the safety berms of the client.

1.2 million gallons of liquid pumped to barge for removal/disposal.
Liquid was pumped from within the berm to a holding tank on site, then by pipeline to awaiting barges in the Port of Corpus Christi.
Lab testing established chloride levels, specific gravity and chemical content.
Proper disposal/recycle program was engineered to dispose of liquid based on lab testing.
Liquids transported and disposed.
Liquid was pumped from within the berm to a holding tank on site, then by pipeline to awaiting barges in the Port of Corpus Christi.
Final cleanup
All liquid was pumped from inside berm. Soil then sampled and any affected soil was treated and site declared remediated.



